PE Film Barrier Testing: How to Read WVTR and OTR

Published · 4 min read

A polyethylene film can be an appropriate part of a moisture-management or protective package, but the word “barrier” is incomplete until the protected product and its failure mode are named. A dry powder, a corrosion-sensitive component and a food application may face different risks. The useful technical question is therefore not whether a film is simply high or low barrier, but which permeant matters, for how long, and under which storage and transport conditions.

Barrier is a package question, not a label

Water-vapour transmission rate, usually abbreviated WVTR, describes the rate at which water vapour passes through a defined area of material under stated conditions. It is useful when moisture gain or loss can change product quality. ASTM F1249 describes an infrared-sensor method for flexible barrier materials and explains that the method reports WVTR, permeance and, for homogeneous materials, permeability coefficient. A report should retain its units, temperature, relative-humidity conditions, film identification and test direction.

WVTR: the moisture pathway

Oxygen transmission rate, or OTR, concerns oxygen moving through the film under the agreed test conditions. ASTM D3985 describes a coulometric-sensor method for film, sheeting, laminates and coextrusions. Its significance section is especially important for purchasing teams: OTR is an important determinant of packaging protection, but it is not the only determinant. A low number alone does not prove a given shelf life, because product sensitivity, headspace, closure and distribution still contribute.

OTR: the oxygen pathway

A transmission value without conditions is not a complete value. Temperature, humidity, pressure difference, test area, specimen thickness and conditioning can all affect interpretation or comparability. Do not compare a supplier result to an internal result until the method, unit and conditions are aligned. If a target is contractual, the buyer and supplier should agree the sampling plan, test laboratory, test conditions, reporting format and acceptance rule before the first production lot is judged.

Test conditions are part of the result

Take samples from identified production material rather than from an unknown offcut. Record resin or layer structure, nominal thickness, lot, roll position, side or orientation where relevant, and any treatment or print. For a multilayer construction, the tested specimen represents the construction actually supplied, not an individual layer inferred from a brochure. Keep retained specimens so that a result can be rechecked when a later filling or storage result raises a question.

Choose the specimen deliberately

Film-body data does not measure every route into a package. A heat seal, fold, gusset, pinhole, perforation, zipper or fitment may determine the practical outcome. Conversion settings and seal contamination can create a package defect even when the web test is within target. That is why a barrier programme links film results with seal-integrity checks and a packed-product trial. The correct sequence is to investigate the complete pack, not to blame film thickness first.

Do not forget seals and converting

Write a specification in language a laboratory can execute. Identify the property as WVTR or OTR, cite the agreed method edition or equivalent method, state the unit and conditions, define the specimen and lot-sampling rule, and state how results are reported. Avoid copying a generic marketing claim into a purchase order. A range or maximum is meaningful only when the method and conditions beside it are fixed. Revision control prevents old test conditions from silently becoming the acceptance basis.

From laboratory data to a specification

Start with the product risk and a defined storage window. Select candidate constructions, test representative film, then make packages with normal production settings. Check seals and visual defects, expose packages to the agreed distribution or storage challenge, and review the product outcome alongside the transmission report. If results differ between lots, first compare construction, thickness, sampling and conditions; changing the whole material design before those controls are checked can hide the real cause.

Control checklist

  • Define the product and the critical permeant.

  • Keep method, unit and test conditions in the same record.

  • Pair film testing with seal and filled-pack trials.

PE bags and sacks · Date Plastik blog

Technical references

ASTM F1249 is the technical reference for WVTR through plastic film and sheeting using a modulated infrared sensor. ASTM D3985 is the technical reference for OTR through plastic film and sheeting using a coulometric sensor. Both standards emphasize defined conditions and agreed acceptance arrangements; they should guide a test plan rather than replace application-specific validation. ASTM F1249 · ASTM D3985

Back to list